Details

TRANSFER OF A 50 MW SOLAR POWER PROJECT IN BINH THUAN

An Opportunity to Acquire a Renewable Energy Project with an Existing Investment Policy and Grid Connection Plan

The renewable energy market does not always offer projects of significant scale with favorable locations and an established grid connection direction to the regional power system.

An opportunity is currently available to acquire a solar power project covering approximately 46 hectares, with an expected capacity of 50 MW in Binh Thuan, suitable for investors, energy companies, or entities with the financial and technical capabilities to continue developing a large-scale power project.

The project benefits from its location, grid connection infrastructure, and an established technical connection plan. Legal documents, project records, and detailed information will be provided directly to serious investors upon request.

1. Overview of the 50 MW Solar Power Project

  • Project area: Approximately 46 hectares.

  • Capacity: 50 MW.

  • Project type: Solar power project.

  • Location: Binh Thuan, Vietnam.

  • Current status: The project has an existing investment policy for power project development based on the available documentation.

  • Grid connection direction: Connection to the regional power system through 110 kV infrastructure.

  • Location: The project is situated in an area associated with the Bình An 3 and Phan Lâm power infrastructure.

This is an attractive type of asset for investors seeking a renewable energy project with an existing legal foundation and technical grid connection plan, rather than having to start the entire process from land acquisition and preliminary grid connection studies.

2. Technical Grid Connection Plan

According to the existing plan, the project is expected to implement a grid connection system consisting of the following major components:

22/110 kV Step-Up Substation

Construction of a 22/110 kV step-up substation, with the following expected configuration:

  • 01 transformer with a capacity of 63 MVA.

  • 02 110 kV outgoing feeder bays at a nearby large-scale solar power plant.

  • Expected synchronized operation with the development schedule of the nearby large-scale solar power plant.

Double-Circuit 110 kV Transmission Line

The proposed grid connection plan includes:

A double-circuit 110 kV transmission line from the 110 kV substation of the Bình An Solar Power Plant, connecting via a branch to the Phan Lâm – Phan Rí 110 kV transmission line.

Current proposed specifications:

  • Double-circuit 110 kV transmission line.

  • Conductor configuration: 2xACSR185.

  • Estimated length: approximately 100 meters.

The relatively short proposed grid connection distance is one of the project's notable factors, as it may significantly reduce the required transmission infrastructure compared with a project requiring a substantially longer connection route.

Note: Technical specifications, grid connection feasibility, project schedule, and investment costs must be independently verified by the investor based on legal documents, technical documentation, and official documents issued by the competent authorities before entering into any transaction.

3. Key Highlights of the Project

Existing Project Development Foundation

Rather than starting with undeveloped land requiring preliminary studies, the project already has an established direction and documentation related to power project development.

50 MW Project Scale

With an expected capacity of 50 MW, this project is suitable for professional companies and investors operating in the renewable energy sector.

110 kV Grid Connection Plan

The grid connection plan has been established based on the existing project documentation, including the proposed substation and 110 kV transmission infrastructure.

Short Proposed Connection Route

The proposed connection route is approximately 100 meters, which is an important factor to be carefully evaluated from both technical and cost perspectives when assessing the project's overall investment requirements.

Transfer Based on the Level of Documentation Completion

Investors may discuss a suitable transfer structure depending on the actual status of the project documentation and the investor's acquisition requirements.

4. Project Transfer Price

The transfer price is discussed based on the project's documentation status and level of completion.

Option 1 – Transfer at the existing investment policy/current project status:
Indicative price: USD 9 million.

Option 2 – Transfer upon completion of the full legal documentation:
Indicative price: USD 12 million.

The final price and transaction structure may be discussed directly based on the actual documentation status, project progress, and the scope of assets and transfer rights included in the transaction.

5. Suitable Investors

The project is suitable for:

  • Companies operating in the energy sector.

  • Solar power and renewable energy investors.

  • Companies with sufficient financial resources and experience in power project development.

  • Investment funds or entities seeking large-scale energy projects.

  • Investors seeking to acquire a project with an existing legal and technical foundation.

6. Documentation Available to Interested Investors

For qualified and serious investors, detailed information may be provided within the appropriate scope, including:

  • Project legal documentation.

  • Investment policy documents.

  • Project location and boundary information.

  • Grid connection plan and diagrams.

  • Information regarding the substation and 110 kV transmission line.

  • Current project progress.

  • Transfer structure and transaction options.

  • Other relevant documents available in the project file.

Investors are advised to conduct legal, technical, grid connection, planning, land-use, and financial due diligencebefore signing any transaction documents.

7. Opportunity for Renewable Energy Investors

The project's key attraction lies not only in its scale of 46 hectares and 50 MW capacity, but also in the fact that it already has a project documentation foundation, a defined location, and a grid connection plan for further development assessment.

For companies seeking renewable energy project opportunities in the Binh Thuan area, this project may be worth considering, subject to verification of all applicable legal, technical, financial, and regulatory conditions.

8. Contact for Project Information and Documentation

Investors interested in the 50 MW solar power project in Binh Thuan are welcome to contact:

Moc Thao Real Estate
Phone: +84 915 092 938

Contact us for detailed information, legal documentation, grid connection plans, project location, and arrangements for an on-site inspection.

Real estate of the same category